Blacksmithing maintenance and specifications: Difference between revisions

From vector-space.org
Jump to navigation Jump to search
Created page with "{| |width="33%"| '''Shop Area:''' Metal Shop '''Tool:''' Blacksmithing '''Requires in-person training:''' Yes  |width="33%"| '''Procedure Number''' MT 130-01, Rev. 0 |wid..."
 
Kbogacik (talk | contribs)
No edit summary
 
Line 9: Line 9:
'''Procedure Number'''
'''Procedure Number'''


MT 130-01, Rev. 0
MT 130-01, Rev. 1
|width="33%"|
|width="33%"|
'''Date'''
'''Date'''


DRAFT
2/1/2021
|}
|}


= General =
= General =


Hell's Forge propane forge
[[File:Forge.png]]


= Reference =
= Reference =
Line 40: Line 40:
* Steel forge housing unit
* Steel forge housing unit


'''THIS IS THE END OF THE PROCEDURE'''
                                              '''END OF THE PROCEDURE'''

Latest revision as of 10:04, 1 February 2021

Shop Area: Metal Shop

Tool: Blacksmithing

Requires in-person training: Yes 

Procedure Number

MT 130-01, Rev. 1

Date

2/1/2021

General

Reference

Maintenance

  • TBD

Specifications

  • Steel burner assembly with brass tips
  • Red pipe(s)
  • Regulator and hose
  • Fire brick(s)
  • Ceramic fiber blanket
  • Refractory cement
  • Steel forge housing unit
                                              END OF THE PROCEDURE